adminandClaude Opus 5.5 b9d1602b94 Arrange graph nodes for the agent and with a button (#429)
An agent that built a graph through MCP left every new node in one
row. In the first real test that put nine nodes on a line 2080 px
long, with the Owner's links running straight through all the others.
Placing nodes by hand cost nine move_node calls and guessed heights.
The agent now gives no coordinates, and the editor lays the nodes out.

- arrange.ts is a pure function. It puts the flow into columns from
  left to right and sets an Owner or Get right before the first node
  it feeds. It orders each column for the fewest crossings and lines
  nodes up by their linked ports without overlaps.
- Node sizes come from the drawn NodeView in the browser and from an
  estimate in unit tests. Both share the constants in nodeBox.ts.
- run_commands arranges the nodes that came without x and y when the
  call ends, inside the same undo step. Nodes that were there stay.
- New command arrange_graph and new tool lint_graph. The lint counts
  overlaps, crossings, links through foreign nodes, backward links
  and the longest links, with example ids.
- The relay instructions tell the agent not to give coordinates and
  to fetch far values with a second Get or Owner node.
- An Arrange button next to the snap magnet in all eight graph tabs.
  It arranges the selected nodes, or all of them, as one undo step.

Found while testing on a real project:

- lint_graph missed a crossing where two links swap rows exactly
  mirrored. Both curves then share a sample point in the middle, and
  only a crossing between two sample points was counted. Links that
  meet on a point count now (segmentsMeet).
- The Arrow-key graph with one Owner for four Moves cannot get below
  8 crossings. The Owner feeds object in row 2 of Move, between exec
  and dt of the key, so it always crosses one of them.

Tests:
- graph-arrange, agent-edit, snap-toggle: 33/33. The swapped-rows
  test was red before the fix (0 instead of 1).
- Four counter-checks that bend arrange or the edit plan, all red.
- e2e 71 on melektaus-atx: 18/18. Lint after the build shows 0
  overlaps, 0 links through nodes, 0 backward. Arrange takes a
  tangled graph from 3 backward links and 2 crossings to 0, and one
  Ctrl+Z restores it.
- Gate on melektaus-atx: CHECK EXIT 0, 318 files, 4917 tests,
  measured before the lint fix.
- Live through MCP on the user's project: lint_graph reports 8
  crossings after Arrange, matching the screenshot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-18 12:09:52 +02:00
..